Recently, the company team was invited to visit Shandong Highland. This visit aims to deepen exchanges and cooperation between the two sides in the fields of screw pumps, pumping units, and new oil extraction equipment, and jointly develop the market.
Held in-depth discussions and cooperation exchanges on the Self-loop Well-flushing Trucks and washing over operation services for the injection wells.
The couplings are internally coated with PFA which could maintain stable performance in high temperature up to 260°C [500°F] and pressure wells while have a high dielectric strength, lower coefficient of friction and better wear resistance than PTFE.
Recently, the Pioneer team made a special trip to conduct in-depth exchanges and discussions on the international market application and future cooperation of aerogel products. The low-cost aerogel composite material has been widely applied in many fields such as aerospace, building energy conservation, pipeline insulation, and has achieved large-scale application in the cement industry, with significant energy-saving effects.
Recently, PIONEER successfully delivered two sets of 5-inch packers and installation tools to a well-known oil company in Pakistan, providing solid technical support for the client's workover project and ensuring that the project can be completed on schedule with high quality.
PIONEER dispatched a team of elite professionals to Jakarta—the capital of Indonesia—for a series of high-level business engagements from September 8 to September 14, 2024. The event marked the hosting of the 15th International Oil and Gas Exploration, Production, and Refining Exhibition. This occasion not only strengthened PIONEER's partnerships with clients in Indonesia and neighboring regions but also established a robust foundation for the company's future expansion within the energy sector.
PIONEER has successfully repaired the 2 7/8" 13Cr-110 tubing premium connection for the customer in Pakistan, marking a significant milestone in the company's step into the service sector. These repaired tubing secure the material supply for the successful execution of the customer’s workover project.